• Testing & Commissioning PP

    380 , 230 , 132 and 115 kv HV GIS Substations testing & commissioning

    DETAILS
  • Modification & Refurbishment

    Modification & Refurbishment

    DETAILS
  • Technical Training services

    Technical Training services

    DETAILS
  • Projects Management

    Technology Sourcing,Residual Engineering...

    DETAILS
  • Electrical Field Services

    DETAILS
  • Installation Activities

    Installation Activities

    DETAILS

Welcome to Our company

It is with much pleasure, we introduce our Organization M R C have well qualified and trained professionals staff , with extensive technical and business experience utilizing professional approach to problem solving.

We provide the best quality and accuracy in

  • Engineering & Design services
  • Erection and Installation of LV, MV, HV Substations & Power Plants
  • 132 KV Substation Testing & Commissioning (WE Have SEC Approval)
  • Switchgear Inspections & Testing
  • Start Up & Commissioning
  • Transformer Testing & Servicing
  • Troubleshooting
  • Electrical Upgrades
  • Protective Relay Testing
  • Preventative Maintenance
  • Protection Retro Fit work
  • High Voltage Test for Cables / Bus bars
  • In-house & Onsite training
  • The coordination study of an electric power system
  • Relay Upgrades, Retrofits and Replacements
  • Power Cable Termination
  • Automation and communication of substation(( Supply , installation and testing commissioning))
  • SAS of substation((testing & commissioning))
  • Civil And Architect Engineering Services
  • Repairs and modifications in civil and architectural accompanying them, including: the entrance halls and lounges, rooms and toilets, stores and sections of gypsum (Bartychen), ceilings, doors, appliances, tools, windows, glass, backgrounds, and plastering work to paint, and disclosure of the leaks water, acts of wood and aluminum, and repair concrete and landscaping.

 

Project Gallery

You have an error in your SQL syntax; check the manual that corresponds to your MySQL server version for the right syntax to use near 'desc' at line 1